Differences between revisions 23 and 27 (spanning 4 versions)
Revision 23 as of 2019-01-28 11:22:52
Size: 2250
Editor: PieterSmit
Comment:
Revision 27 as of 2019-02-02 11:08:02
Size: 2776
Editor: PieterSmit
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * 2019 - http://www.level.org.nz/water/water-supply/mains-or-rainwater/harvesting-rainwater/
 * 2019 - https://www.rainline.co.nz/
Line 17: Line 19:
 * 2019 - http://www.yourhome.gov.au/water/rainwater
Line 35: Line 38:
 * Circulate hotwater to keep tap hot, reducing waste while waiting for water to heat.
   1. At taps circulate hotwater back into cold until heated.
 * Circulate hot water to keep tap hot, reducing waste while waiting for water to heat.
   1. At taps circulate hot water back into cold until heated.
Line 38: Line 41:
== Water Harvesting components ==
 * Leafe catcher
 * First flush diverters are typically sized to divert about 10L per 50m2 of roof plan area
 * Bug filters into the tank
 * Slow-release into the tank, horizontal T above the bottom
 * Overflow retrieving water from the bottom of the tank
 * Drain valve
 * Pressure booster pump

Water

Water Harvesting components

  • Leafe catcher
  • First flush diverters are typically sized to divert about 10L per 50m2 of roof plan area
  • Bug filters into the tank
  • Slow-release into the tank, horizontal T above the bottom
  • Overflow retrieving water from the bottom of the tank
  • Drain valve
  • Pressure booster pump

...


CategoryEcoFriendly

eco/water (last edited 2019-02-02 11:08:02 by PieterSmit)