Differences between revisions 13 and 15 (spanning 2 versions)
Revision 13 as of 2011-06-07 15:32:25
Size: 1029
Editor: PieterSmit
Comment:
Revision 15 as of 2013-06-02 22:43:41
Size: 1288
Editor: PieterSmit
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 * [[http://www.wetec.co.za/article.php?a_id=20|Wetec]] How to install a complete rain harvesting system
Line 18: Line 19:
 * Circulate hotwater to keep tap hot, reducing waste while waiting for water to heat.
   1. At taps circulate hotwater back into cold until heated.

Water

...


CategoryEcoFriendly

eco/water (last edited 2019-02-02 11:08:02 by PieterSmit)