Differences between revisions 4 and 12 (spanning 8 versions)
Revision 4 as of 2014-02-22 10:31:42
Size: 484
Editor: PieterSmit
Comment: Artificial muscle
Revision 12 as of 2018-03-11 02:22:38
Size: 1167
Editor: PieterSmit
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 * Electric gates http://www.gatemaster.co.nz
 * In concrete slab water storage - https://www.aquacomb.co.nz/
 * 2017 - !LiteForm - ICF Blocks and concrete.
   * http://liteform.com/wp-content/uploads/2017/05/FB_install_print2017.pdf
Line 7: Line 11:
* http://www.greenbuildingadvisor.com/blogs/dept/musings/green-building-beginners
Line 11: Line 16:
... = Heat mass =

 * [[http://en.wikipedia.org/wiki/Trombe_wall|.]]A simplistic rule of thumb that is often used when designing dense masonry walls, is that heat will be absorbed and lost at around an inch per 2 hours. i.e a 4inch (100mm) thick masonry wall will absorb and shed its heat load in around 8 hours and a 8inch (200mm) thick wall in around 16 hours.

Eco friendly building

* http://www.greenbuildingadvisor.com/blogs/dept/musings/green-building-beginners

Heat mass

  • .A simplistic rule of thumb that is often used when designing dense masonry walls, is that heat will be absorbed and lost at around an inch per 2 hours. i.e a 4inch (100mm) thick masonry wall will absorb and shed its heat load in around 8 hours and a 8inch (200mm) thick wall in around 16 hours.