Differences between revisions 15 and 21 (spanning 6 versions)
Revision 15 as of 2018-04-21 23:26:22
Size: 2208
Editor: PieterSmit
Comment:
Revision 21 as of 2018-06-17 21:49:00
Size: 2640
Editor: PieterSmit
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 * Links [[Building/Borer]]
Line 16: Line 17:
   * https://www.building.govt.nz/assets/Uploads/building-code-compliance/e-moisture/e2-external-moisture/constructing-cavities.pdf
Line 18: Line 20:
   * Storage - cool side of house    * Storage - on the cool side of house
Line 23: Line 25:
 * Roof designed for solar
   * http://www.roofer.co.nz/case-studies/a-unique-power-generating-roof/
Line 24: Line 28:
 * Build for solar in future
   * [[attachment:2014-Build-pv_solar_ready.pdf]]
Line 30: Line 36:

* Green Homes New Zealand: 2018:[[attachment:GHNZeBook2016-Web181116.pdf]]

Eco friendly building

Design ideas / principles

Adhoc items for the home

* Green Homes New Zealand: 2018:GHNZeBook2016-Web181116.pdf

* http://www.greenbuildingadvisor.com/blogs/dept/musings/green-building-beginners

Heat mass

  • .A simplistic rule of thumb that is often used when designing dense masonry walls, is that heat will be absorbed and lost at around an inch per 2 hours. i.e a 4inch (100mm) thick masonry wall will absorb and shed its heat load in around 8 hours and a 8inch (200mm) thick wall in around 16 hours.


CategoryEcoFriendly

eco/building (last edited 2018-06-17 21:49:00 by PieterSmit)