Differences between revisions 1 and 10 (spanning 9 versions)
Revision 1 as of 2010-02-27 07:21:26
Size: 254
Editor: PieterSmit
Comment:
Revision 10 as of 2017-11-08 19:25:50
Size: 1057
Editor: PieterSmit
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
 [[http://www.stepin.org/casestudy.php?id=edenproject&page=9|Eden]] in Cornwell England.  * 2017 - !LiteForm - ICF Blocks and concrete.
   * http://liteform.com/wp-content/uploads/2017/05/FB_install_print2017.pdf
Line 9: Line 10:
... * http://www.greenbuildingadvisor.com/blogs/dept/musings/green-building-beginners
 [[http://www.stepin.org/casestudy.php?id=edenproject&page=9|Eden]] in Cornwell England. Geodesic domes.
 * Designing underfloor water heating. [[attachment:ITS-SOLAR-underfloor-heatingAfripex.pdf]]
 * Twisted fishingline muscles
    * http://io9.com/scientists-just-created-some-of-the-most-powerful-muscl-1526957560
= Heat mass =

 * [[http://en.wikipedia.org/wiki/Trombe_wall|.]]A simplistic rule of thumb that is often used when designing dense masonry walls, is that heat will be absorbed and lost at around an inch per 2 hours. i.e a 4inch (100mm) thick masonry wall will absorb and shed its heat load in around 8 hours and a 8inch (200mm) thick wall in around 16 hours.

Eco friendly building

* http://www.greenbuildingadvisor.com/blogs/dept/musings/green-building-beginners

Heat mass

  • .A simplistic rule of thumb that is often used when designing dense masonry walls, is that heat will be absorbed and lost at around an inch per 2 hours. i.e a 4inch (100mm) thick masonry wall will absorb and shed its heat load in around 8 hours and a 8inch (200mm) thick wall in around 16 hours.


CategoryEcoFriendly

eco/building (last edited 2018-06-17 21:49:00 by PieterSmit)