 * <!> Important neutral schemes
 * four-pole breaker and therefore, the neutral wire is also sectioned.
   * During neutral switching spikes can be experienced, as neutral floats until connected to generator.
   * Sollution is to use transformer isolation downstream of UPS, generating new independent neutral.
     * adding a transformer in the by pass (static and dynamic)

3 Phase Power

  • 2012 After having problems with UPS & Gen set failure due to Neutral failure, did some investigation.

    • Failure of Switch-over box.
  • Features
    • double conversion technology - separates the input ac power from the output power
      • Less desirable design is off-line, line-interactive or delta
  • Important factor
    • input power factor of the UPS
    • Efficiency at <50% especially important if dual UPS used in data-center.

  • Installation factors to consider.
    • UPS installation design - space cabling etc.
    • Redundant configuration n+1
    • Downstream earthing system: TN-S if transformer is in ownership and TT if it is not
    • Neutral section equal or double to phases
    • Different protection to UPS grid connection and by-pass connection
    • Over voltage protections downstream and upstream UPS
    • Disconnecting switch at UPS output to easy replacement
    • Air conditioning system

Switch box's / commutation

  • Switch from mains power to generator in case of failure or testing.
  • commutation between the grid connection and the generator
  • <!> Important neutral schemes

  • four-pole breaker and therefore, the neutral wire is also sectioned.
    • During neutral switching spikes can be experienced, as neutral floats until connected to generator.
    • Sollution is to use transformer isolation downstream of UPS, generating new independent neutral.
      • adding a transformer in the by pass (static and dynamic)
  • Makes
    • TELYS
    • NEXYS

Battery's

  • BACS - Battery Analyze & Care System

    • Some can retrofit on current system, add unit to each battery.
  • Alternate
    • Flywheel DC storage system.
      • Riello Fly Wheel 215KW - spinning at 36,000 RPM

Generator

  • Standby Rating, Prime Power, Continuous Rating.
  • Things to check
    • Sizing and selection
    • Electrical factors
    • Cooling
    • Ventilation
    • Fuel storage
    • Noise
    • Exhaust
    • Starting systems

...