* <!> Important neutral schemes * four-pole breaker and therefore, the neutral wire is also sectioned. * During neutral switching spikes can be experienced, as neutral floats until connected to generator. * Sollution is to use transformer isolation downstream of UPS, generating new independent neutral. * adding a transformer in the by pass (static and dynamic) |
3 Phase Power
2012 After having problems with UPS & Gen set failure due to Neutral failure, did some investigation.
- Failure of Switch-over box.
- Features
- double conversion technology - separates the input ac power from the output power
- Less desirable design is off-line, line-interactive or delta
- double conversion technology - separates the input ac power from the output power
- Important factor
- input power factor of the UPS
Efficiency at <50% especially important if dual UPS used in data-center.
- Installation factors to consider.
- UPS installation design - space cabling etc.
- Redundant configuration n+1
- Downstream earthing system: TN-S if transformer is in ownership and TT if it is not
- Neutral section equal or double to phases
- Different protection to UPS grid connection and by-pass connection
- Over voltage protections downstream and upstream UPS
- Disconnecting switch at UPS output to easy replacement
- Air conditioning system
Switch box's / commutation
- Switch from mains power to generator in case of failure or testing.
- commutation between the grid connection and the generator
Important neutral schemes
- four-pole breaker and therefore, the neutral wire is also sectioned.
- During neutral switching spikes can be experienced, as neutral floats until connected to generator.
- Sollution is to use transformer isolation downstream of UPS, generating new independent neutral.
- adding a transformer in the by pass (static and dynamic)
- Makes
- TELYS
- NEXYS
Battery's
BACS - Battery Analyze & Care System
- Some can retrofit on current system, add unit to each battery.
- Alternate
- Flywheel DC storage system.
- Riello Fly Wheel 215KW - spinning at 36,000 RPM
- Flywheel DC storage system.
Generator
- Standby Rating, Prime Power, Continuous Rating.
- Things to check
- Sizing and selection
- Electrical factors
- Cooling
- Ventilation
- Fuel storage
- Noise
- Exhaust
- Starting systems
...